Engineering Work on Saturday, 26 August and 2 September 2017

Engineering Works on both dates – Charing Cross, Waterloo East and London Bridge are all closed.

On Saturday, 26 August, we will travel on the train departing Victoria 10:01, Bromley South 10:27, Orpington 10:35, Sevenoaks 10:44, arriving Tonbridge 10:52. Change there, stay on Platform 3 and take the 10:59, arriving Battle 11:42.

Return from Hastings at 17:09, 17:39, or 09 or 50 minutes after each hour thereafter. Change at Tonbridge and stay on Platform 2 for Sevenoaks, Orpington, Bromley South, Victoria.

On Saturday, 2 September, we will travel on the train departing Cannon Street 10:20, Orpington 10:40, Sevenoaks 10:50, Tonbridge 11:00, arriving Battle 11:42.

Return from Hastings at 16:50, 17:20, 17:50, 18:20, 18:50, 19:50 to Tonbridge, Sevenoaks, Orpington, Cannon Street.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s