Stage 2 Complete

After some lovely walks on the 20th and 27th May the second stage of The Hastings Line 2017 is complete. There were 45 walkers setting off from Hither Green spread over the two weeks.

Our very professional photographer Smilax has rejoined us and his great photo album from Stage 2 is at the link below.

Smilax Stage 2 Photos

Get ready for the first walk of Stage 3 this Saturday.

Walk Instructions for Stage 3 and 4 Now Available

The information sheets for Stage 3 and 4 of The Hastings Line 2017 have now been uploaded as well as some small changes to the front page and travel information. The updated printed information pack will be available on the walk  (Stage 2 Hither Green to Chelsfield) and later walks.

Front page (timetable)

Travel Information (2 sides)

Walk instructions for Stage 3 (2 sides)

Walk instructions for Stage 4 (2 sides)

For best results, use high quality printing and make sure the scaling is 100% – do not fit to printer margins or the map scales will shrink. Inkjet ink is likely to run if it gets damp – make photocopies if necessary.

Stage 1 Complete!

Stage1.jpg

After the very successful walks on the 6th and 13th May the first stage of The Hastings Line 2017 is complete. There were 45 walkers setting off from central London spread over the two weeks.

Get ready for the first walk of Stage 2 this Saturday.

The Hastings Line 2017 information pack Part 1

The first instalment of The Hastings Line 2017 information pack is finally ready, in time for the first walk on Saturday. It consists of:

Front page (timetable)

Travel information (2 sides)

Map of the whole walk series

Walk instructions for Stage 1 (2 sides)

Walk instructions for Stage 2 (2 sides)

Photocopies will be available on Saturday, and pdfs are now available on this website for downloading and printing.

For best results, use high quality printing and make sure the scaling is 100% – do not fit to printer margins or the map scales will shrink. Inkjet ink is likely to run if it gets damp – make photocopies if necessary.

The Hastings Line 2017 travel information

To simplify the information sheets, the travel timetables for The Hastings Line 2017 set of walks has been compiled separately.  See the link below  although with all the engineering work this Summer you are advised to check train times before travel with http://www.nationalrail.co.uk/ or Tel 03457 48 49 50.

For stages 3 to 9, in case of delayed trains, we will wait for the arrival of the train which was due to arrive nearest the published start time.

The Hastings Line 2017 travel information