Get Ready for The Hastings Line 2017

The Hastings Line will be a series of nine walks on Saturdays through the Summer from Charing Cross to Hastings seafront going through all stations on the connecting line. Each walk will be 7 to 10 miles covering a total of 77 miles by the end. Each walk can be completed in two shorter stages if preferred.

A Hastings Line 2017 information pack, which includes route notes and 1:20,000 scale route maps for each of the nine walks will be available during each walk for £2.00. Copies of the information pack may be downloaded from this website as well as copies of the information for each walk. See the menu item above or the link below:

The Hastings Line 2017

With the regular engineering works on the South Eastern railway network every weekend it is difficult to give the public transport details too far in advance. The details of the transport arrangements for each walk will be shown on this website a week before each walk.

The first walk is on the 6th May from Charing Cross to Hither Green station.

Information sheet The Hastings Line 2017 Stage 1

Advertisements